ConocoPhillips
Type of resources
Topics
Keywords
Contact for the resource
Provided by
Representation types
Update frequencies
Resolution
-
An oil and gas industry rig site survey acquired between March and April 2002. The block number traversed was 15/30.
-
An oil and gas industry rig site survey acquired in January 2001. The block number traversed was 49/16.
-
An oil and gas industry site survey for debris clearance acquired in April 2005. The block number traversed was 16/26.
-
An oil and gas industry rig site and habitat survey acquired between January and February 2007. The block number traversed was 30/6.
-
An oil and gas industry rig site survey acquired between April and May 1997. The block number traversed was 164/7.
-
An oil and gas industry site survey for a pipeline/cable route acquired between March and April 2001. The block numbers traversed were 44/17 and 44/22.
-
An oil and gas industry swathe bathymetric site survey for seabed infrastructure (Britannia Platform) acquired in April 2003. The block number traversed was 16/26.
-
An oil and gas industry site survey acquired between March and April 2001. The block number traversed was 44/22.
-
An oil and gas industry site survey for debris clearance acquired in October 2004. The block number traversed was 30/2.
-
An oil and gas industry site survey for debris clearance acquired in April 2005. The block number traversed was 30/7.